STAGE 5 Agenda
A. Introduction
1.0 Attendees present
2.0 Other key H&S Duty holders on the scheme
3.0 Review of Health and Safety Register
B. Project Briefing (Presentation)
Note: Not required for STAGE 5
C. Existing Environment (workshop)
Note: Not required for STAGE 5
D. Build / Construct-ability
Note: Not required for STAGE 5
E. Maintenance Review List
Note: Not required for STAGE 5
F. Workplace Review
Note: Not required for STAGE 5
G. End User Safety / Handover Review
Pre Handover / Occupancy Considerations
1.0 Detail of specialist high risk systems within the completed design (i.e compressed air, gas systems, confine spaces, pressure vessels, legionella risks, flammable liquids etc.)
2.0 Detail of Equipment with life safety elements (lifts, hoists)
3.0 Safety related training for end users (hoists, specialist plant, fire alarm system etc.)
4.0 Interaction arrangements with future Facilities Managers prior to building handover (during commissioning).
5.0 Confirmation of recept of all life safety inspection and test certification (Fire alarm systems, Lifts etc) *GATE Hold STAGE 5
6.0 Handover - Health and Safety File Information protocol
7.0 Establish occupancy plan – End User Considerations
7.1 Fire Risk Assessments
7.2 End user occupancy Health and Safety management arrangements
7.3 End user risk assessments
7.4 End user procedures
7.5 End user safe system of work
H. Any Other Business
1.0 Project Health and Safety Review – Going forward and improving
2.0 Any other business from attendees?